floor tile layer
Roland Construction
Vernon, BC, CA
29 $ / heure (estimé)
Permanent
- Education : Secondary (high) school graduation certificate
- Experience : 7 months to less than 1 year
Tasks
- Inspect, measure and mark surfaces to be covered
- Measure, cut and fasten underlay and underpadding
- Prepare flooring plans and scheduling
- Measure, cut and install carpeting on floors
- Measure, cut and install resilient floor coverings
- Prepare and install hardwood floors
- Inspect and repair damaged floor coverings
- Conduct moisture, ph, temperature and other tests prior to flooring installations
- Prepare floors for installations
- Remove existing floor coverings and contaminants
- Read and interpret blueprints, maps, drawings and specifications
Work conditions and physical capabilities
- Physically demanding
- Handling heavy loads
- Bending, crouching, kneeling
- Hand-eye co-ordination
Personal suitability
- Organized
- Team player
- Work Term : Permanent
- Work Language : English
- Hours : 30 to 40 hours per week
Il y a 11 jours