Education :Expérience :Education
- No degree, certificate or diploma
Work site environment
- Odours
- Dusty
Tasks
- Inspect, measure and mark surfaces to be covered
- Measure, cut and fasten underlay and underpadding
- Prepare flooring plans and scheduling
- Measure, cut and install carpeting on floors
- Measure, cut and install resilient floor coverings
- Prepare and install hardwood floors
- Inspect and repair damaged floor coverings
- Estimate costs and materials
- Prepare floors for installations
- Remove existing floor coverings and contaminants
- Install carpeting on walls or other surfaces
- Employ knee kickers and other equipment to stretch carpeting
- Perform direct glue-down carpet installations
- Perform double-bond carpet installations
- Install resilient stair components (special effects for the visually impaired)
- Install materials on counter tops and raised platforms
Installation specialization
- Vinyl or resilient tiles
- Vinyl or resilient sheets
- Ceramic tiles
- Marble tiles
- Borders or feature strips
- Flash covings
- Hardwood intricate patterns flooring
- Parquet flooring
- Modular carpet tiles
Transportation / travel information
- Own transportation
Work conditions and physical capabilities
- Physically demanding
- Handling heavy loads
- Bending, crouching, kneeling
- Ability to distinguish between colours
- Hand-eye co-ordination
Experience
- 3 years to less than 5 years
- Durée de l'emploi : Permanent
- Langue de travail : Anglais
- Heures de travail : 35 to 44 hours per week