Bridging North America (BNA), a partnership of Fluor, ACS Infrastructure Canada and Aecon Group Inc., is seeking candidates for the Gordie Howe International Bridge project. BNA was selected to design, build, finance, operate and maintain the CAD$5.7 billion (approximate US$4.4 billion) Gordie Howe International Bridge project for Windsor-Detroit Bridge Authority (WDBA).
When completed, the bridge will be the longest cable-stayed bridge in North America. The project includes a bridge and border crossing spanning the Detroit River and connecting Detroit, Michigan, U.S., and Windsor, Ontario, Canada, by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 (Rt. Hon. Herb Gray Parkway) in Ontario. The scope also includes building new, state-of-the-art ports of entry on both the U.S. and Canadian sides of the Detroit River as well as improvements to existing infrastructure in both Michigan and Ontario.
This position is open to current students in the co-op work experience program and will run from January – April 2025
POSITION SUMMARY :
Reporting to the Systems Manager, the field engineer is responsible for providing technical and engineering support at the front end of systems installation. Will be phased into the construction group, initially reporting to the Electrical and Instrumentation Manager.
POSITION RESPONSIBILITY :